Tianjin Logistics Energy Audit

Sector: Logistics Year: 2023 City: Tianjin, China Gross Floor Area (GFA): 96,970 sqm Scope: Energy Audit and Net Zero Pathway Calculations (CRREM)

Targeted energy audit and CRREM-aligned net zero pathway for a logistics warehouse in Tianjin. The project identified practical ECMs focused on lighting, HVAC retrofits, renewable integration, and smart monitoring to enhance energy efficiency and sustainability.

Recommended ECMs
  • Indoor lighting renovation.
  • Outdoor lighting control system.
  • Split air conditioner retrofit.
  • Solar PV installation.
  • Smart monitoring of energy systems.
  • Faucet aerator installation.
  • Eco-friendly awareness initiatives.
Estimated Impact
  • Annual Energy Savings: 2,970 MWh
  • Payback Period: Less than 3.5 years

Result: A streamlined set of measures enabling significant operational savings, with a short payback period and clear alignment to net zero objectives.