Tianjin Logistics Energy Audit

Sector: Logistics Year: 2023 City: Tianjin, China Gross Floor Area (GFA): 99,505 sqm Scope: Energy Audit and Net Zero Pathway Calculations (CRREM)

Comprehensive energy audit and CRREM-aligned net zero pathway for a large logistics facility in Tianjin. The assessment identified actionable ECMs across lighting, HVAC controls, boiler optimization, pumping systems, on-site solar, and smart monitoring to secure long-term performance.

Recommended ECMs
  • Indoor lighting renovation.
  • Outdoor lighting control system.
  • Split air conditioner retrofit.
  • VRF centralized control retrofit.
  • Gas boilers optimization.
  • Variable frequency drives (VFDs) for circulation pumps.
  • Solar PV installation.
  • Smart monitoring of energy systems.
  • Faucet aerator installation.
  • Eco-friendly awareness initiatives.
Estimated Impact
  • Annual Energy Savings: 12,120 MWh
  • Payback Period: Less than 4.1 years

Result: A robust, cost-effective roadmap combining operational upgrades, controls, and renewables, delivering substantial savings while advancing a credible net zero trajectory.