Shanghai Logistics Energy Audit 2024

Sector: Logistics Year: June 2024 City: Shanghai, China Gross Floor Area (GFA): 9,000 sqm Scope: Energy Audit Level 2 (ASHRAE)

Level 2 audit of a logistics facility in Shanghai to identify actionable energy efficiency improvements across lighting, HVAC, envelope, power distribution, and controls, with a focus on measurable savings and maintainable operations.

Recommended ECMs
  • Lighting System Upgrades: Replace outdated fixtures with LEDs and add occupancy sensors.
  • HVAC Optimization: Repair/upgrade to high-efficiency units; deploy programmable thermostats.
  • Building Envelope: Repair façade, improve insulation, replace windows, install air curtains.
  • Power Distribution: Simplify network; install sub-meters for granular monitoring.
  • Operational Changes: Routine maintenance, staff training, optimized delivery operations.
Further Measures
  • Energy Recovery: Heat recovery ventilation / energy recovery systems.
  • Renewables: Assess feasibility and install rooftop solar PV where viable.
  • Controls: Upgrade temperature & humidity control; add variable speed drives.
  • Monitoring: Expand sub-metering and dashboards to track KPIs and persistence of savings.
Estimated Impact

Estimated savings of 491 MWh/year, corresponding to a 51.3% reduction in energy consumption and 346 tCO₂/year in avoided emissions, with a payback period of 3.0 years.